HVAC for the Indoor Practice Facility
Does anyone have any idea when the heating and cooling for the Indoor Practice Facility will be done?

16 Replies

D
DurhamHokie
4mo
What our gym owner used to say...
At our CrossFit gym (which does not have HVAC), the owner used to joke when people complained about the cold was that he "had a part on order... called May"... and in the summer that part would be called October. It was funny, and we just suffered through the conditions, it's not that big of a deal - and it made us tougher.
S
Shore hop
4mo
Seems odd that this wasn’t done at inception?
V
vtlee
4mo
I remember Coach Beamer saying "this is the last thing I'll ask for"
We were so naive. At the time we thought we had built the football practice Taj Mahal. We extremely happy with what we had accomplished
91HokieBob 91HokieBob
4mo
Visit this site. It explains EVERYTHING about the design and project from
WM Jordan Company.
H
HokieKanger
4mo
Probably cost related. They probably had a list of must haves and a list of
nice to haves.
1
1947Sunbowl
4mo
Different persepective at the time
Beamer and program felt vt as blue collar and didnt need the so called bell and whistles- absolutely no long term vision and vt being in a bubble.
bourbonstreet bourbonstreet
4mo
yes; ^^^this^^^... they did not want it too, soft. (Thermo' wimpy).
1
1947Sunbowl
4mo
at that time, the old methods
In that era, many didnt see at the time, the direction of collegiate sports, as well as long term player health and injury, It was the mentality of embracing a the Green Bay environment of the nineteen sixties. . Also, VT was also in the bubble of "VT is different, our blue collar, more work ethic and toughness can out do the delta in money from more established fully resourced programs." Thank goodness we are moving forward
91HokieBob 91HokieBob
4mo
Add cost savings and IIRC, they claimed the overall "Green" design of the
structure with its windows would provide enough solar or thermal heating and the raised garage doors and high ceiling would provide cooling during hot weather. LMAO. ** Edited by 91HokieBob at 3/24/2026, 11:14:22 AM ** Edited by 91HokieBob at 3/24/2026, 11:32:48 AM
U
uber hokie
4mo
We were blue collar back then and damn good. Very soft since Beamer
retired, nothing to do with lack of vision.Who at that time could have envisioned players being paid huge sums of money and being coddled and entitled to the point they currently are ? More likely it was Weavers miserly penny pinching habits. Of course I’m sure someone here will try to blame it on WB even though he wasn’t AD at the time, but he’s apparently responsible for everything else negative that happens. ** Edited by uber hokie at 3/22/2026, 3:28:39 PM ** Edited by uber hokie at 3/22/2026, 3:30:55 PM
1
1947Sunbowl
4mo
THe project is under design expedited.
However, its a big job, not only the HVAC unit, but insulatiing the building, new ducts, additional electircal service. etc. The Design was authorized by BOV in February, therefore the firm will be working on it, to include project final estimate, construction drrawings etc. Also, once awarded, the contractor will have to order the long lead items, for the HVAC plant and/or transformers if needed. THe project is completed, on interior work, and scheduling when the practice facility is not being used for insulation, and ducting, replaced doors if needed and controls.
V
VT ChemE 1986
4mo
So, some time this fall?
1
1947Sunbowl
4mo
that's my guess (however)
The football program, will expect construction/installation to minimize interruption of practice. My guess is 1. get design complete (asap) and get it out to bid. PRIORITY 2. design the construction, do the installation and ducting and insulation and wiring inside the building first and then 'plug' in the outside HVAC equipment and electrical service (that doesnt interrupt the use of the indoor field. BTW, While the HVAC system is going on, I expect Franklin to freshen the graphics in the practice field. THe key is can the university building dept, handle high priority urgent constructoin and MEET deadlines as needed. THey will be managing (projet mgr, contract officer) for the HVAC system, as ewll as the new LED lighting and Scoreboard (right after graduation). and all be reading game 1. Lets see if the unversity ethos, can handle increase in efficiency.
HtownHokie HtownHokie
4mo
before the tree-top solar panels are installed above stadium woods
E
EDGEMAN
4mo
But they have to cut the tops off of those trees before mounting the...
...solar panels, so... (TIC)
HtownHokie HtownHokie
4mo
the answer is always "use unistrut" vs marring any Stadium Woods trees. it
works well in the real world.