Pfizer bldg conversion update
I recall some expressed interest in updates on the screw up at the former Pfizer HQ conversion and modification.
“The engineering firm that designed the structural plans for the city’s largest office-to-housing conversion project says reinforcing steel meant to support the weight of a 14-story addition to the building was never installed”
Link:
Mistakes were made
6 Replies
That work was totally safe and effective
(In response to this post by Va AandM)
2w
if you are in to order of things...
(In response to this post by Va AandM)
2w
(In response to this post by Va AandM)
2w
Engineering is sometimes advanced by post-mortem learning.
(In response to this post by Tuckahokie)
2w
And there have been many indictments of inspectors for taking bribes over a decade or so. This will become interesting. At least it failed before occupancy.
(In response to this post by Tuckahokie)