Hokiedc
H
734
Posts
0
Threads
289
Likes
Member since:
May 28, 2003
Last post:
04/18/2022 09:20 AM ET
Posting History (5)
The Lounge
2 y ago
Highway construction every summer. 2 hours a day each day 5.5 days / week
Overtime kicked in every Thursday @10:00AM
Sheep footer operator one summer and Blasting crew member the next summer.
The Lounge
3 y ago